gogogo

Optimisation of cycle and response times of industrial controllers in a high volume manufacturing environment.

Curley, Alan.

Optimisation of cycle and response times of industrial controllers in a high volume manufacturing environment. [thesis] / Alan Curley. - Limerick : Limerick Institute of Technology, 2015. - xii, 245 p. : ill. ; 30 cm.

Thesis submitted for M. Eng. (2015).

Includes bibliographical references and index.


Theses--LIT--Moylish.
Electrical/electronic engineering theses.

Thesis M.Eng. 15/01

Powered by Koha