Software project management in practice / Pankaj Jalote.

By: Material type: TextTextPublication details: Boston : Addison-Wesley, 2002.Description: xv, 262 p. : ill. ; 24 cmISBN:
  • 0201737213 (alk. paper)
Subject(s): DDC classification:
  • 005.1068 JAL
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Standard Loan Moylish Library Main Collection 005.1068 JAL (Browse shelf(Opens below)) 1 Available 39002000368416

Enhanced descriptions from Syndetics:

Delivering high-quality software on time and on budget: it can be done . Pankaj Jalote introduces a set of practices and principles that have been used to successfully execute hundreds of projects -- of all types and sizes. Software Project Management in Practice presents the complete set of processes employed -- and proven effective -- at one of the world's most successful software organizations, Infosys Technologies. These processes, grounded in common sense and supported by simple metrics, can systematically improve the planning and execution of any software project. Since these processes satisfy the requirements of CMM Level 5 -- the industry's most challenging software process standard -- this book's examples illuminate project management as performed by a highly mature development organization. For all project managers and software professionals who may be called upon to manage projects.

Includes bibliographical references and index.

Table of contents provided by Syndetics

  • Preface (p. xiii)
  • Chapter 1 Managing Software Projects (p. 1)
  • 1.1 Processes and Project Management (p. 2)
  • 1.2 Project Management and the CMM (p. 4)
  • 1.2.1 Overview of the CMM (p. 5)
  • 1.2.2 KPAs for Project Management (p. 7)
  • 1.3 Project Management at Infosys (p. 10)
  • 1.3.1 Background: Infosys (p. 10)
  • 1.3.2 SEPG Support to Projects (p. 11)
  • 1.3.3 Senior Management Involvement in Projects (p. 12)
  • 1.3.4 Training for Project Managers (p. 12)
  • 1.3.5 The Project Management Process (p. 13)
  • 1.4 Overview of the ACIC Case Study (p. 15)
  • 1.5 Summary (p. 17)
  • 1.6 References (p. 17)
  • Part I Project Planning (p. 19)
  • Chapter 2 The Project Planning Infrastructure (p. 21)
  • 2.1 The Process Database (p. 22)
  • 2.1.1 Contents of the PDB (p. 22)
  • 2.1.2 A Sample Entry (p. 23)
  • 2.2 The Process Capability Baseline (p. 26)
  • 2.3 Process Assets and the Body of Knowledge System (p. 29)
  • 2.4 Summary (p. 32)
  • 2.5 References (p. 33)
  • Chapter 3 Process Planning (p. 35)
  • 3.1 The Infosys Development Process (p. 35)
  • 3.1.1 The Standard Process (p. 36)
  • 3.1.2 Process Tailoring (p. 38)
  • 3.1.3 Example: Tailoring for Short-Duration Projects (p. 40)
  • 3.2 Requirement Change Management (p. 42)
  • 3.2.1 The Change Management Process (p. 43)
  • 3.2.2 Examples (p. 44)
  • 3.3 Process Planning for the ACIC Project (p. 46)
  • 3.4 Summary (p. 48)
  • 3.5 References (p. 49)
  • Chapter 4 Effort Estimation and Scheduling (p. 51)
  • 4.1 Estimation and Scheduling Concepts (p. 51)
  • 4.1.1 Effort Estimation Models (p. 52)
  • 4.1.2 Estimating Schedule (p. 53)
  • 4.2 Effort Estimation (p. 54)
  • 4.2.1 The Bottom-up Estimation Approach (p. 55)
  • 4.2.2 The Top-Down Estimation Approach (p. 57)
  • 4.2.3 The Use Case Points Approach (p. 58)
  • 4.2.4 Effectiveness of the Overall Approach (p. 60)
  • 4.2.5 Effort Estimate of the ACIC Project (p. 61)
  • 4.3 Scheduling (p. 65)
  • 4.3.1 Overall Scheduling (p. 65)
  • 4.3.2 The Effectiveness of the Approach (p. 68)
  • 4.3.3 Detailed Scheduling (p. 68)
  • 4.3.4 The Schedule of the ACIC Project (p. 70)
  • 4.4 Summary (p. 72)
  • 4.5 References (p. 74)
  • Chapter 5 Quality Planning (p. 77)
  • 5.1 Quality Concepts (p. 78)
  • 5.1.1 Procedural Approach to Quality Management (p. 79)
  • 5.1.2 Quantitative Approaches to Quality Management (p. 80)
  • 5.2 Quantitative Quality Management Planning (p. 82)
  • 5.2.1 Setting the Quality Goal (p. 82)
  • 5.2.2 Estimating Defects for Other Stages (p. 83)
  • 5.2.3 Quality Process Planning (p. 84)
  • 5.3 Defect Prevention Planning (p. 85)
  • 5.4 The Quality Plan of the ACIC Project (p. 87)
  • 5.5 Summary (p. 90)
  • 5.6 References (p. 92)
  • Chapter 6 Risk Management (p. 93)
  • 6.1 Concepts of Risks and Risk Management (p. 94)
  • 6.2 Risk Assessment (p. 97)
  • 6.2.1 Risk Identification (p. 98)
  • 6.2.2 Risk Prioritization (p. 98)
  • 6.3 Risk Control (p. 100)
  • 6.3.1 Risk Management Planning (p. 101)
  • 6.3.2 Risk Monitoring and Tracking (p. 101)
  • 6.4 Examples (p. 103)
  • 6.4.1 The ACIC Project (p. 103)
  • 6.4.2 The XYZ Project (p. 105)
  • 6.5 Summary (p. 105)
  • 6.6 References (p. 108)
  • Chapter 7 Measurement and Tracking Planning (p. 109)
  • 7.1 Concepts in Measurement (p. 109)
  • 7.1.1 Metrics and Measurements (p. 110)
  • 7.1.2 Process Monitoring through Statistical Process Control (p. 111)
  • 7.2 Measurements (p. 114)
  • 7.2.1 Collecting Effort Data (p. 114)
  • 7.2.2 Logging and Tracking Defects (p. 115)
  • 7.2.3 Measuring Schedule (p. 120)
  • 7.2.4 Measuring Size (p. 120)
  • 7.3 Project Tracking (p. 120)
  • 7.4 The ACIC Measurement and Tracking Plan (p. 123)
  • 7.5 Summary (p. 123)
  • 7.6 References (p. 124)
  • Chapter 8 The Project Management Plan (p. 127)
  • 8.1 Team Management (p. 127)
  • 8.1.1 Team Structure (p. 128)
  • 8.1.2 Communication (p. 129)
  • 8.1.3 Team Development (p. 129)
  • 8.2 Customer Communication and Issue Resolution (p. 130)
  • 8.3 The Structure of the Project Management Plan (p. 131)
  • 8.4 The ACIC Project Plan (p. 131)
  • 8.5 Summary (p. 152)
  • Chapter 9 Configuration Management (p. 153)
  • 9.1 Concepts in Configuration Management (p. 154)
  • 9.2 The Configuration Management Process (p. 157)
  • 9.2.1 Planning and Setting Up Configuration Management (p. 158)
  • 9.2.2 Perform Configuration Control (p. 160)
  • 9.2.3 Status Monitoring and Audits (p. 162)
  • 9.3 The ACIC Configuration Management Plan (p. 164)
  • 9.4 Summary (p. 172)
  • 9.5 References (p. 172)
  • Part II Project Execution and Closure (p. 175)
  • Chapter 10 Reviews (p. 177)
  • 10.1 The Review Process (p. 178)
  • 10.1.1 Planning (p. 179)
  • 10.1.2 Overview and Preparation (p. 179)
  • 10.1.3 Group Review Meeting (p. 180)
  • 10.1.4 Rework and Follow-up (p. 181)
  • 10.1.5 One-Person Review (p. 181)
  • 10.1.6 Guidelines for Reviews in Projects (p. 182)
  • 10.2 Data Collection (p. 184)
  • 10.2.1 Self-Preparation Log (p. 184)
  • 10.2.2 Group Review Meeting Log (p. 184)
  • 10.2.3 Group Review Summary Report (p. 186)
  • 10.3 Monitoring and Control (p. 186)
  • 10.3.1 The Review Capability Baseline (p. 186)
  • 10.3.2 Analysis and Control Guidelines (p. 187)
  • 10.3.3 An Example (p. 191)
  • 10.4 Introduction of Reviews and the NAH Syndrome (p. 192)
  • 10.4.1 The Infosys Experiment (p. 193)
  • 10.4.2 Data from the Experiment (p. 194)
  • 10.5 Summary (p. 196)
  • 10.6 References (p. 197)
  • Chapter 11 Project Monitoring and Control (p. 199)
  • 11.1 Project Tracking (p. 201)
  • 11.1.1 Activities Tracking (p. 201)
  • 11.1.2 Defect Tracking (p. 201)
  • 11.1.3 Issues Tracking (p. 202)
  • 11.1.4 Status Reports (p. 202)
  • 11.2 Milestone Analysis (p. 208)
  • 11.2.1 Actual Versus Estimated Analysis of Effort and Schedule (p. 208)
  • 11.2.2 Monitoring Quality (p. 210)
  • 11.2.3 Risk-Related Monitoring (p. 211)
  • 11.2.4 Milestone Analysis for the ACIC Project (p. 212)
  • 11.3 Activity-Level Analysis Using SPC (p. 215)
  • 11.4 Defect Analysis and Prevention (p. 217)
  • 11.4.1 Performing Pareto Analysis (p. 217)
  • 11.4.2 Performing Causal Analysis (p. 218)
  • 11.4.3 Developing and Implementing Solutions (p. 221)
  • 11.4.4 DP in the ACIC Project (p. 222)
  • 11.5 Process Monitoring and Audit (p. 227)
  • 11.5.1 Conducting the Audit (p. 228)
  • 11.5.2 Follow-up Actions (p. 229)
  • 11.6 Summary (p. 232)
  • 11.7 References (p. 233)
  • Chapter 12 Project Closure (p. 235)
  • 12.1 Project Closure Analysis (p. 235)
  • 12.1.1 The Role of Closure Analysis (p. 236)
  • 12.1.2 Performing Closure Analysis (p. 237)
  • 12.1.3 Closure Analysis Report (p. 238)
  • 12.2 The ACIC Closure Analysis Report (p. 240)
  • 12.3 Summary (p. 250)
  • 12.4 References (p. 250)
  • Index (p. 253)

Excerpt provided by Syndetics

The genesis of this book dates back to 1996. For my sabbatical, I joined Infosys as the head of quality, with the charter of improving the processes for project execution. Seeing the problems faced by project managers, I felt that software project management must be the toughest job on the planet. And I thought that delivering high-quality software within budget and on schedule must be an oxymoron. The situation, I now realize, is not quite that hopeless. By using sound project management processes, project managers in some organizations are successfully executing projects. Infosys, one such global organization, has successfully executed more than 500 projects last year alone. It has about 10,000 employees spread across 25 cities in more than a dozen countries around the globe, and it has been assessed at the highest maturity level (level 5) of the CMM. Its revenues and profits have grown at about 75% per year for the past five years. The level of customer satisfaction can be judged by the fact that despite the company's huge growth about 85% of its revenue comes from repeat orders from existing customers. I have used my experience and knowledge of Infosys processes to cull out and describe in this book the key project management practices that have been used to successfully execute project after project. The beauty of these practices is that despite being highly effective, they are not complex; rather, they are grounded in common sense and are supported by simple measurements and analyses. In describing project management processes at Infosys, the book offers a unique combination of two value propositions. First, it provides the complete set of processes employed for project management in a highly successful organization. The use of these processes is illustrated with real examples and a running case study. Second, because the processes satisfy the requirements of the Capability Maturity Model (CMM), this book demystifies the way projects are managed in a high-maturity organization, and it provides the benefits that the CMM offers to project management without the need of a detailed understanding of the CMM. The book is written primarily for project managers and for professionals who plan to become project managers. By using the methods described in this book they can systematically improve the planning and execution of their projects. It can also be very useful for an organization that wants to reach a high maturity level. If project managers start using the methods described here, they will lay the foundations for high maturity in the organization. Because most chapters begin with an overview before describing the details of the Infosys method, this book can also be used as a text in a software project management course. In a general software engineering course, it can serve as a supplementary text, providing a view of how a software project is managed in a business environment. Chapter 1 contains a brief introduction to Infosys and the relationship of the CMM and project management. The remainder of the book is divided into two parts. Part I, consisting of Chapters 2 through 9, focuses on project planning and covers topics such as planning infrastructure, process planning, effort and schedule estimation, quality planning, risk management, measurement planning, and configuration management. Part II, consisting of Chapters 10 through 12, focuses on project execution and completion and covers reviews, project monitoring and control, and project closure. To the extent possible, each chapter has been kept independent and stand-alone and has been organized as follows. The relevant concepts and background material are given in the first section, followed by a discussion of methods used by Infosys. Next come examples of the use of these methods in real projects and in the case study. Each chapter ends with a summary that lists the key takeaways from the chapte Excerpted from Software Project Management in Practice by Pankaj Jalote All rights reserved by the original copyright owners. Excerpts are provided for display purposes only and may not be reproduced, reprinted or distributed without the written permission of the publisher.

Author notes provided by Syndetics

Pankaj Jalote is Professor and Chairman of the Department of Computer Science and Engineering at the Indian Institute of Technology, Kampur

Powered by Koha