000 | 00900nam a2200217 a 4500 | ||
---|---|---|---|
008 | 2015 | ||
082 | 0 | 4 | _aThesis CM 15/03 |
100 | 1 | _aNunan, Darragh | |
245 | 1 | 4 |
_aThe influences of Building Information Modelling (B.I.M.) in main contracting. _h[thesis] / _cDarragh Nunan. |
260 |
_aLimerick : _bLimerick Institute of Technology, _c2015. |
||
300 |
_aviii, 96 p. : _bill. ; _c30 cm. |
||
502 | _aThesis submitted for B.Sc. in Construction Management 2015. | ||
504 | _aIncludes glossary, bibliographical references and appendices. | ||
650 | 0 |
_aTheses _xLIT _zMoylish. |
|
650 | 0 | _aConstruction management theses. | |
650 | 0 | _aBuilt environment theses. | |
902 | _a171006 | ||
907 |
_a.b12240266 _bmoyl _cmoyl |
||
942 | _n0 | ||
998 |
_b0 _c150629 _dm _eg _f- _g4 |
||
999 |
_c42720 _d42720 |