000 00937nam a2200217 a 4500
008 2017
082 0 4 _aThesis CM 17/02
100 1 _aCronin, Trevor
245 1 0 _aBarriers facing contractors and sub-contractors on the implementation of Building Information Modelling (BIM) in Ireland.
_h[thesis] /
_cTrevor Cronin.
260 _aLimerick :
_bLimerick Institute of Technology,
_c2017.
300 _a105 p. :
_bill. ;
_c30 cm.
502 _aThesis submitted for B.Sc. in Construction Management 2017.
504 _aIncludes glossary, bibliographical references and appendices.
650 0 _aTheses
_xLIT
_zMoylish.
650 0 _aConstruction management theses.
650 0 _aBuilt environment theses.
902 _a171006
907 _a.b12510476
_bmoyl
_cmoyl
942 _n0
998 _b0
_c170703
_dm
_eg
_f-
_g0
999 _c45541
_d45541